The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
Glue down hardwood floor installation.
Because of the way it is installed there isn t a hollow sound when walking across the floor or a spongy feel this is something that can be an issue with floating floors if they aren t installed perfectly and with optimal conditions.
On the contrary many installers prefer to use glue down floors because they re more stable and if the glue is good you can avoid a lot of the problems that bug other flooring methods.
Glue down hardwood floors are amongst the first of their kind but that doesn t mean that they went obsolete with the passing of time.
How to install glue down engineered wood flooring on concrete slab preparation.
Glued down flooring sounds more solid and is less forgiving as you walk.
Subfloor preparation is critical on all job sites but especially for glue down.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
The floor will be glued directly to the sub flooring using a hardwood flooring adhesive.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Glue down hardwood flooring often sounds more like real solid hardwood flooring than floating floors do.
As mentioned previously glued down floors are a bit of a more permanent option.
With that said one of the most important factors while dealing with glue down installation is going to be your subfloor.